the goal: seismic safety retrofit of existing structure & one additional HOV lane (east bound only)

Port Mann bridge, B.C.

the achievement
planned modifications to widen lanes (from 4 to 5)

plan-brace tees

brace tees

brace tee connections

knee braces

before

after

traffic flows smoother due to five lane expansion

all photos courtesy R. Third

Rob Third

Director,
George Third & Son (GTS)
Vice-President of EDSL,
6010 Trapp Ave.,
Burnaby, BC, CANADA V3N 2V4
steel@gthird.com
Phone: 604.526.2333,
Facsimile: 604-526-3733
www.geothird.com
find on map

Brett Third

President,
Empire Dynamic Structures Ltd. (EDSL)
1515 Kingsway Avenue,
Port Coquitlam , B.C.,
CANADA,
V3C 1S2
brett.third@empireds.com
Phone: (604) 941-9481,
Facsimile: (604) 941-7447
www.dynamicstructuresltd.com
find on map

about me
| contacts | © 2007 S.F. Stiemer, Department of Civil Engineering, University of British Columbia